Wednesday, July 22, 2009

So much going on at Country Crossing

They are getting so much done around the site. December 1st is going to be here before we know it at the crews are working at a feverish pace to get everything done by the grand opening.

At ground level, well I guess technically below ground, the sewer system and drainage system are going in. There is equipment everywhere with huge piles of dirt and pipe everywhere.


Grading work is going on all over and the amphitheater is starting to take shape.
Amphitheater

While we where down in the Holler I caught Blair grinning like a fat cat as he was checking out the bed and breakfast. It really is taking shape. The stone guys are busily installing ALL of the stone. The HVAC looks like it is about finished. The plumbing is coming along and should be finished shortly. The electricians are getting boxes set and lighting in place. In the next couple of days there will be wire all over the place.


Up on the hill the bingo complex is really starting to take shape. I was really surprised to see the number of people that were working on the bingo pad. They are putting in the cinder block walls, the metal is still going in and the whole building should be covered very soon. They are also already hanging HVAC ducts from the ceiling. I know that I have mentioned this before but this building is going to be HUGE!

No comments:

Post a Comment