Wednesday, September 23, 2009

Things are finally looking BLUE out at Country Crossing

After a week of almost constant clouds and rain everyone on site at Country Crossing was really glad to see the beautiful blue skies this morning.

Photobucket

But once again even with the weather not cooperating an amazing amount of progress has been done in the last few days. In the Bingo pavilion real progress has been made. I will start at the top and work my way down. On the roof the membrane roofing is going in on the flat sections and all of the slopes have been covers with the tar paper. In the ceiling the electrical is getting finished, the HVAC is about done, the sprinkler system is getting installed, the low voltage (phone, internet, etc.) is being put in place. All of the walls have been framed and are getting insulated and Sheetrocked. There is already a crew going behind the installers and mudding the joints of the drywall. On the floors all of the concrete work in the interior of the building is finished and they are already laying tile in the bathrooms. The interior walls are in that define where the restaurants are and in one of them a stage is already built and in place. It is already feeling like a building and there is no doubt that all of the work will be done in time for the December 1st Grand Opening.



Around the property the curbing continues to go in and the drainage system is being installed. It was really nice to see fire hydrants around the property. I also was very excited to see grass being put in and that there was blacktop in one of the parking lots. I noticed that they were doing a lot of final grading work on the main roadway and expect to see it paved very shortly.

No comments:

Post a Comment