Saturday, October 31, 2009

Progress as of 10-31

Happy Halloween to all. I was very impressed with the amount of labor that was out on the site even in the weather and on this holiday. Everything continues to keep progressing and moving forward.

The Possum Holler Bed and Breakfast is getting very close. About 95% of the flooring is in throughout the building. The tile and the hardwood floors are finished upstairs and very close downstairs. A lot of the finish items like towel bars and such are in. There is not much longer and we will start to see furnishings.


Around the property more and more grass and landscaping is going in and they are even beginning to set the lamp posts.

In the Bingo Pavilion the details are really starting to show through. Carpeting and furniture are being installed. This is going to look like a very classy place!