Saturday, November 14, 2009

Progress as of 11-13-09

The Amphitheater is really starting to take shape now that the stage is being erected. I took these pictures at 10am and they had only been working on it since the day before. With less then a month before the first concert there is not doubt that the show WILL go on as scheduled. In regards to the Kellie Pickler Wiregrass food bank concert. As of noon on Friday they had received enough money and food donations to serve over 96,000 meals. WOW! that is a HUGE benefit to the Wiregrass area. Thank you Country Crossing. Not only are they providing jobs they are feeding the area's most needy! The left hand bathrooms/concessions is getting its brick and they are building the connecting roof from the ticket office to the restroom/concessions buildings.



The Possum Holler Bed and Breakfast and the Bluegrass Hollow RV Park are coming right along. The Bed and Breakfast is getting furnished and the finishing touches are being tweaked to make the whole facility look perfect. All of the pads are poured in the RV park and they are working on getting the roadways in. At the same time they are working on hooking up all of the power boxes and bringing in top soil so the landscaping can follow.



Signs are going up on the Bingo Pavilion!! Lorrie Morgen's Hot Chicken was the first portion on the venue to get the sign put up. Inside, the restaurants have the walls decorated and are either getting the flooring put in or it is complete. All of the food service equiptment is on site and are either installed or in the process of being installed. Out on the main Bingo floor the cashier area has the counter tops and the drink area's are taking shape. The rest of the building is getting finished up and everything is taking shape for the December 1st Grand opening.

No comments:

Post a Comment